How the worst hour is found

Heat does not flow through the building envelope at a steady rate. Sun angles, wall shading and the delay of heat passing through heavy construction all change with the time of day and the season. So, for each room, the application searches every month of the year and every hour of the day and keeps the single hour with the largest envelope gain.

When a room follows a schedule, the search adds the people, lighting, equipment and fresh-air gains at each hour, scaled by that hour's percentages, and keeps the hour with the largest total rather than the largest envelope gain alone. A room at Always 100% is searched exactly as before, because its gains are the same in every hour.

The outdoor weather the search starts from comes from the Climate & site settings of the load configuration. The construction of the walls, roof and partitions comes from the Construction settings, and the sun through windows comes from each window preset's glazing type and shading.

Shaping the year from the design day

Each station sheet gives, for every month, a design dry-bulb with the wet-bulb that usually goes with it and a design wet-bulb with the dry-bulb that usually goes with it, at the monthly percentage that matches the annual one you chose (see Percentile), together with the daily ranges that belong to each. The dry-bulb design day peaks at the month's design dry-bulb in the mid-afternoon and falls below it by its range times a fixed hourly fraction; its wet-bulb follows the same shape and never exceeds the dry-bulb. The wet-bulb design day, run only with "Peak dry-bulb & wet-bulb", is built the other way round. Every hour of every month therefore has its own outdoor dry-bulb and wet-bulb, and walls, roof, glass, fresh air and infiltration are all charged at that hour's pair.

Walls and roof

The outside face of a wall or roof is treated as being at its sol-air temperature: the outdoor air temperature plus the sun it absorbs (more for a High-absorptance surface than a Light one), less a small sky term on a roof. The sun is the clear-sky irradiance on that face for the station, the month and the hour, so a west wall is hottest late in the afternoon and a roof at noon.

The heat does not arrive at once. The wall's or roof's layers, from the preset, give 24 conduction time factors that say what share of each past hour's temperature difference reaches the room now. Heavy construction spreads the day's heat over many hours and peaks late; light construction follows the sun.

Qwall = U × Anet × Σn=0…23 cn × (Tsol-air, hour − n − Tindoor)

Qroof = U × Afloor × Σn=0…23 cn × (Tsol-air, hour − n − Tindoor) (top floor only)

where U is the wall's Exterior wall type, Anet is the wall area less its windows, the roof is the floor's Roof preset and Afloor is the room's floor area.

Time delay of radiant gains

The sun through glass, people, lights, equipment and the heat through walls and roof all have a radiant share. The room's surfaces absorb it and release it over the following hours. The rest is load in the hour it arrives.

How the radiant share returns is the radiant time series. A Heavy building spreads it over more hours than a Light one (set under Construction class); a carpet returns it sooner, because the slab underneath stores less. A room with more glass in its exterior wall gets its own series. Set Radiant time delay to No in Construction and every gain is load in its own hour.

Glass, partitions and the ground slab

Heat conducted through glass uses the outdoor temperature of the hour. Internal walls (partitions) use the month's design temperature, reduced by the percentage set with Partition ΔT, but only over the length of wall that faces unconditioned space; the rest of the wall carries nothing. The U-value is the wall's Interior wall type. Internal windows and doors count as part of the partition. The ground slab uses the same month figure reduced by Ground ΔT.

Qglass, conduction = U × A × (Toutdoor, hour − Tindoor)

Qpartition = Σ Uwall × Acharged × (Tdesign, month − Tindoor) × (1 − reduction)

Qslab = U × Afloor × (Tdesign, month − Tindoor) × (1 − reduction) (ground floor only)

Sun through windows

The beam sun on the glass, the diffuse light from the sky and the light reflected off the ground are each worked out for the window's orientation, the month and the hour. The beam reaches only the part of the glass an overhang or fin leaves sunlit, and counts at the glass's SHGC for that hour's angle of incidence; the diffuse parts count at the glass's diffuse SHGC, the sky share reduced by the part of the sky an overhang hides.

Qsolar = Awindow × [ Ebeam × sunlit fraction × SHGC(θ) + (Esky × sky view + Eground) × SHGCdiffuse ]

The peak

For every month and hour, all of the envelope terms are added together for that same moment. The largest total is the envelope peak. Because the terms are taken at one moment, a room with big west windows will peak in a late afternoon, while a north-facing room may peak at a different time. In cool months the conduction terms can be negative and partly cancel the sun.

Qenvelope = max over months and hours of ( Qwall + Qroof + Qglass, conduction + Qpartition + Qslab + Qsolar )

What happens next

The envelope peak is only the first part of the room load. To it the application adds the heat from people, lighting and equipment, and, when the room carries an infiltration figure, the heat and moisture of the outdoor air leaking in. It then applies the Design margins to those room loads, and works the result, together with the sensible and moisture loads of the fresh air, through the coil chain described under Coil and duct allowances.

Infiltration is typed per room, on the room properties panel, as air changes per hour: how many times in an hour the room's whole volume of air is replaced by leaked outdoor air. Nothing is assumed when the field is left blank. A typed value is charged in full, whether or not the fresh air pressurises the room, so leave the field blank for a room whose fresh-air supply outweighs its leakage. The leaked air flow is the air changes times the room volume, floor area times ceiling height, divided by 3600, and it is charged as a room load with the same sensible and moisture formulas as the fresh air on the Summer indoor design page.

V̇infiltration = ACH × Afloor × Hceiling ÷ 3600

With "Peak dry-bulb & wet-bulb" this whole sequence runs once for each design day and the larger total is kept; see Calculation method.